1233D - Tallawong Public School - Herkese Açık Proje Sahası
-
04th Haziran 2025, Electrical In - Ground and In - Slab Live Services
Please view the attached markup of electrical in-ground and in-slab services supplying temp boards from the generator located on the lower ground. The generator is to be operated by RCC and Pro Electrical Staff only.
Ekler :
LIVE IN GROUND SERVICES.pdf
-
26th Mayıs 2025, Lifting Activities - Mobile Plant
Lifting equipment must be appropriately used on site.
Ekler :
Pits, Risers & Pipe Lengths often exceed the Working Load Limit of small excavators.
Pre-planning Activities & Risk Assessments must be completed prior to conducting works. If the lift exceeds the WLL of the machine, talk to RCC.
* Lifting equipment must be in a register provided via Hammertech to RCC
*Shackles attached to Close Eye Lifting points on excavators must be done up fully.
*Operators must ensure the lifting equipment is not rolled over the hitch & side loaded.
*Lifting gear must be in line (up & down)
*When lifting using chains, angle of chains must be no smaller than 60 degrees to ensure balanced loading between chain legs.
using-powered-mobile-plant-as-a-crane-information-sheet (1).pdf
Lifting_with_an_Excavator_2_1024x1024.jpg
-
28th Mart 2025, Silica Management Practical Guidance Requirements
Silica Management - Practical Guidance
Ekler :
HEPA On Tool Vacuum Extraction Units for SDS & Rotary Hammer Drills
M or H Class Filter Vacuums, continuous bags vacuums preferred
P2 or Half Face Respirator Usage
RCC Silica Practical Guidance.pdf
Geçerli Saha Hava Durumu
Son Güncelleme Saati: 13:21
Sıcaklık: 20C (App 18C)
Rüzgar Hızı: 2KMH
Maks. Rüzgar: 28KMH @00:21
Saat 9'dan beri yağmurlu: 0,0mm
Min Sıcaklık: 10C @18:49 13.07.2025
Maks Sıcaklık: 20C @13:20
Bora: 6KMH
Maks Bora: 35KMH @00:21
Gözlem Konumu - Richmond, NEW SOUTH WALES
Zaman Dilimi - Doğu Avustralya Standart Saati
Tahmin - Pazartesi, 14 Temmuz
Shower or two.
Min: 5C Maks: 15C
Yağmur İhtimali: 70%
Beklenen Yağmur: 0 kime 4mm
Tahmin Konumu - Blacktown, NEW SOUTH WALES
Zaman Dilimi - Doğu Avustralya Standart Saati
Yarın - Salı, 15 Temmuz
Sunny.
Min: 3C Maks: 18C
Yağmur İhtimali: 10%
-
RCC #001B Planning & Communication - Construction Rev03 Feb 2025b
Yüklenen 28.03.2025
save_alt İndir
Bu sahanın KKD Gereksinimlerini biliyor musunuz?
Sahadaki ilk gününüzde doğru güvenlik ekipmanlarına sahip olduğunuzdan emin olun.
Sahaya geldiğinizde kısa süre içinde çalışmaya başlamak için hazırlanın.
Saha kaydınızı çevrimiçi tamamlayın ve zamandan kazanın.
Bu sahanın KKD Gereksinimlerini biliyor musunuz?
Sahadaki ilk gününüzde doğru güvenlik ekipmanlarına sahip olduğunuzdan emin olun.
Sahaya geldiğinizde kısa süre içinde çalışmaya başlamak için hazırlanın.
Saha kaydınızı çevrimiçi tamamlayın ve zamandan kazanın.