1233D - Tallawong Public School - Cantiere del progetto pubblico
-
04th giugno 2025, Electrical In - Ground and In - Slab Live Services
Please view the attached markup of electrical in-ground and in-slab services supplying temp boards from the generator located on the lower ground. The generator is to be operated by RCC and Pro Electrical Staff only.
Allegati :
LIVE IN GROUND SERVICES.pdf
-
26th maggio 2025, Lifting Activities - Mobile Plant
Lifting equipment must be appropriately used on site.
Allegati :
Pits, Risers & Pipe Lengths often exceed the Working Load Limit of small excavators.
Pre-planning Activities & Risk Assessments must be completed prior to conducting works. If the lift exceeds the WLL of the machine, talk to RCC.
* Lifting equipment must be in a register provided via Hammertech to RCC
*Shackles attached to Close Eye Lifting points on excavators must be done up fully.
*Operators must ensure the lifting equipment is not rolled over the hitch & side loaded.
*Lifting gear must be in line (up & down)
*When lifting using chains, angle of chains must be no smaller than 60 degrees to ensure balanced loading between chain legs.
using-powered-mobile-plant-as-a-crane-information-sheet (1).pdf
Lifting_with_an_Excavator_2_1024x1024.jpg
-
28th marzo 2025, Silica Management Practical Guidance Requirements
Silica Management - Practical Guidance
Allegati :
HEPA On Tool Vacuum Extraction Units for SDS & Rotary Hammer Drills
M or H Class Filter Vacuums, continuous bags vacuums preferred
P2 or Half Face Respirator Usage
RCC Silica Practical Guidance.pdf
Meteo attuale del cantiere
Ultimo aggiornamento su: 12:21
Temperatura: 18C (App 15C)
Velocità del vento: 6KMH
Max. Vento: 28KMH @00:21
Pioggia dalle 9.00: 0,0mm
Temp min: 10C @18:49 13/07/2025
Temp max: 19C @12:06
Raffica: 7KMH
Raffiche max: 35KMH @00:21
Luogo di osservazione - Richmond, NEW SOUTH WALES
Fuso orario - Ora standard dell’Australia orientale
Previsioni - lunedì, 14 luglio
Shower or two.
Min: 5C Max: 15C
Possibilità di pioggia: 70%
Precipitazioni previste: 0 a 4mm
Luogo previsioni - Blacktown, NEW SOUTH WALES
Fuso orario - Ora standard dell’Australia orientale
Domani - martedì, 15 luglio
Sunny.
Min: 3C Max: 18C
Possibilità di pioggia: 10%
-
RCC #001B Planning & Communication - Construction Rev03 Feb 2025b
Caricato 28/03/2025
save_alt Scarica
Conosci i requisiti dei DPI per questo cantiere?
Assicurati di avere l'equipaggiamento di sicurezza corretto per il primo giorno in cantiere.
Inizia a lavorare prima quando arrivi sul cantiere.
Completa la registrazione del cantiere online con la massima comodità e risparmia tempo.
Conosci i requisiti dei DPI per questo cantiere?
Assicurati di avere l'equipaggiamento di sicurezza corretto per il primo giorno in cantiere.
Inizia a lavorare prima quando arrivi sul cantiere.
Completa la registrazione del cantiere online con la massima comodità e risparmia tempo.